INSTALLATION TIPS
-Install vertically with cartridge hanging down.
-Allow 2-1/2″ (6.35 cm) clearance below the cartridge for easy cartridge replacement.
-Flush 7SI cartridge by running water through filter for five minutes at full flow.
-This system must be installed and maintained according to the
manufacturers instructions, including installation and replacement of filter cartridges.
OPERATION TIPS
-Change cartridges on a regular six month preventative maintenance program.
-Change cartridges when capacity is reached or when pressure falls below 10 psi (0.7 bar).
-Service flow rate must not exceed 3.5 gpm (13.25 Lpm).
-Always flush the filter cartridge at time of installation and cartridge change.
SIZING
-Service Flow Rate: 3.5 gpm (13.25 Lpm)
-Rated Capacity: 25,000 gallons (94,635 L) of particulate and scale reduction